Add or Edit Inspection Details

After inspecting a sub-surface utility permit subsequent to closeout, an inspection date and results can be added on the Edit Inspection Details screen. They display in the Subsequent Inspection Details section.

To add or edit inspection details:

1.      Navigate to the Inspections & Closeout Screen.

2.      Click the [Edit] button on the Subsequent Inspection Details section. The Edit Inspection Details screen displays.

3.      Enter a date in the Inspection Date field.

4.      Select Yes or No from the Highway Failure field.

5.      If Highway Failure field is Yes, enter the reasons why an inspection was rejected in the Comment field.

6.      Click the [Save & Exit] button to save the information entered and return to the Inspections & Closeout Screen, which now reflects the updated information.